main floor bathroom

This little room was a deceptive amount of work. It seemed like it wasn’t going to be much, but once we got into it and decided to take down the drop ceiling, it kicked our butts. After my boys demoed the old ceiling and prepped the walls and all the plumbing work was done, we hired the guys hanging the drywall in the basement to finish this ceiling. Then the rest was the usual: scraping, sanding, repairing plaster walls, priming, painting. The tub and shower stall was in decent shape; we did replace the shower head. I refreshed the vanity with a coat of paint and Brian replaced the faucet. We installed quarter round. I hung a new medicine cabinet, and flipped the lights upside down. Brian installed the light/fan combo. We also replaced the toilet seat, towel bars and hooks. We kept the brown vinyl plank flooring.The door pictured here is not the one we kept. We found an old door similar in style to the other panel doors at the Habitat ReStore and fit it into place.

Jack picked the bright lime green shower curtain, and it’s fantastic.

  • Walls: Behr Cameo White

  • Trim: Behr Cameo White

  • Vanity: Behr Grayhound

  • New medicine cabinet: Lowe’s

  • Ceiling light/fan combo: Menards

bathroom8.jpg
bathroom1.7.JPG
bathroom1.5.jpg